The former Croydon Park Hotel – once a 211-bed conference hotel with an indoor pool and squash courts – is being repurposed into an aparthotel called The Canopy, after its developer Amro Partners abandoned a consented 447‑home build‑to‑rent tower scheme for the same site. This article traces the site’s winding redevelopment journey, explains what the new aparthotel will offer, and suggests where to stay in Croydon while the hotel remains closed. All key claims are drawn from planning records, trade reporting and local journalism, with sourcing transparently noted.

Last checked: 2026-10-05

Property Name: Croydon Park Hotel (formerly Clarion) · Location: Croydon, London, England · Current Status: Closed for redevelopment into aparthotel · Key Feature: Indoor heated pool, gym, squash courts, sauna

How we researched this

Last checked 2026-10-05.

Sources reviewed: Croydon Council planning committee reports, HTA Design project statement, Estates Gazette trade reporting, Serviced Apartment News specialist coverage, BD Online construction publication, Inside Croydon local news, GLA planning consultation pages, Addiscombe West community website.

We did not conduct an on‑site visit, did not interview the developer or council officers, and did not independently verify the current planning status of the revised aparthotel scheme beyond published reports.

Snapshot: Key facts about the Croydon Park Hotel site

1 Original hotel capacity
2 Botanical House (approved scheme)
  • 447 build‑to‑rent homes, 20% affordable (HTA Design)
3 Revised aparthotel (The Canopy)
4 Acquisition price
  • £24 million by Amro Partners and Flemyn (Serviced Apartment News)
Attribute Details
Property NameCroydon Park Hotel (formerly Clarion)
LocationCroydon, London, England
Current StatusClosed for redevelopment into aparthotel
Key FeatureIndoor heated pool, gym, squash courts, sauna

What happened to the Croydon Park Hotel?

The hotel operated for years as a 211‑bed conference property with leisure facilities including an indoor swimming pool, squash courts and a gym. After closing – reportedly around 2023 or 2024 – Croydon Council sold the site to build‑to‑rent developer Amro Partners, which initially pursued a high‑rise residential scheme called Botanical House. That proposal, designed by HTA Design, received planning approval in 2025 and would have delivered approximately 447 homes across two connected buildings, including a 39‑storey tower. The planning committee report from October 2024 described a scheme of about 450 flats in Use Class C3, with 43 basement car‑parking spaces, 14 blue‑badge spaces and 718 cycle‑parking spaces (Croydon Council planning report).

The original project also included 20% affordable housing – a mix of Discounted Market Rent and London Living Rent – plus shared amenities such as a roof terrace, gym, cinema room, communal lounges and co‑working space (HTA Design).

Sale to Amro Partners

Amro Partners and its joint‑venture partner Flemyn acquired the vacant former hotel for £24 million, according to trade publication Serviced Apartment News. The same report described the property as a 211‑bed hotel. Local news outlet Inside Croydon indicated that the site was briefly owned by the council before passing into private hands.

Redevelopment into aparthotel

In February 2026, Estates Gazette reported that Amro had decided to pivot from the consented high‑rise scheme to a lower‑risk aparthotel conversion. An Amro representative told the publication: “Together with our JV partner, we undertook a comprehensive review of both the approved consent and the existing asset, as well as the wider investment landscape, identifying a clear opportunity to reposition the building as a high‑quality aparthotel catering to both long‑ and short‑stay guests” (Estates Gazette).

The revised approach, named The Canopy, reportedly contains 246 studios and apartments and retains the existing hotel structure rather than demolishing it for a new tower. Estates Gazette noted that staying within the existing hotel use class could reduce planning and delivery risk. Serviced Apartment News stated that operational completion is targeted for the first quarter of 2027.

The bottom line: The Croydon Park Hotel is being transformed from a traditional hotel into a flexible aparthotel, after a short‑lived plan to build hundreds of rental flats was shelved in favour of a more cautious conversion strategy.

Who bought the Park hotel?

Amro Partners profile

Amro Partners is a London‑based build‑to‑rent developer with a portfolio of institutional‑grade rental housing and, more recently, aparthotel projects. Together with joint‑venture partner Flemyn, it acquired the former Croydon Park Hotel from Croydon Council. The deal was first reported by Estates Gazette in February 2026. Amro Living, an affiliated management company, was identified as the intended operator of the original Botanical House scheme (BD Online).

The implication: Amro’s shift from build‑to‑rent to aparthotel signals a pragmatic response to changing market conditions, prioritising speed and lower capital risk over the originally consented high‑rise vision.

Is Croydon a nice area?

Croydon is a large town in South London that has been undergoing significant regeneration for more than a decade. It offers frequent trains to central London (Victoria, London Bridge and St Pancras in roughly 15–20 minutes) and a mix of shopping centres, restaurants, and green spaces such as Lloyd Park and the South Norwood Country Park.

Neighbourhood character

The area around the former hotel – near Altyre Road and Addiscombe Grove – is mostly residential, with a mix of Victorian terraces and newer apartment blocks. The Addiscombe West community website has noted local concerns about tower heights and construction disruption. For visitors who prefer a quieter base with excellent rail connections, Croydon offers a lower‑cost alternative to central London hotels.

Transport links

East Croydon station, a 10‑minute walk from the hotel site, provides frequent services to central London, Gatwick Airport and the Sussex coast. Tramlink services also connect the area to Wimbledon, Beckenham and New Addington.

Why this matters: While Croydon may not have the immediate tourist appeal of central London, its transport connectivity and evolving dining and cultural scene make it a practical base for business travellers and budget‑conscious visitors – exactly the audience The Canopy aparthotel intends to serve.

Original hotel specifications (pre‑closure)

Aspect Details (from historical listings)
Rooms206 rooms and 5 junior suites (original configuration)
Leisure facilitiesIndoor heated pool, gym, squash courts, sauna
DiningRestaurant and bar on site (name not specified in sources)
ParkingOn‑site car park (capacity not specified)
Former brandClarion Hotel (pre‑rebranding)

Other hotels in Croydon to consider while the Park Hotel is closed

For travellers who need accommodation in Croydon while the Croydon Park Hotel site is under redevelopment, several alternatives are available. The following options were mentioned in organic search results and general knowledge:

  • Hilton London Croydon – A well‑known chain hotel near East Croydon station, offering a gym, restaurant and conference facilities.
  • Leonardo Hotel London Croydon – Previously a Jurys Inn, this modern hotel is located next to the Whitgift Centre shopping mall.
  • Croydon Apartments by Aparthotel.com – Self‑catering studios and apartments in the town centre, suitable for longer stays.

These properties provide a range of price points and amenities, though none replicate the leisure facilities – pool, squash courts, sauna – that the Croydon Park Hotel once offered.

Our pick for travellers currently seeking Croydon accommodation

For business travellers who prioritise proximity to the station and consistent quality, the Hilton London Croydon is a reliable choice. Budget‑conscious visitors and longer‑stay guests may prefer the flexibility of self‑catering apartments such as those offered by Aparthotel.com. Once The Canopy opens in 2027, it will likely become the strongest option for those who value both short‑ and long‑stay flexibility in the same location.

Timeline of the Croydon Park Hotel redevelopment

  • 2023‑12: Planning application 23‑00872‑FUL submitted for up to 455 homes and community floorspace (Greater London Authority planning consultation).
  • 2024‑10: Croydon Council planning committee material describes demolition and high‑rise build‑to‑rent scheme of approximately 450 flats (Croydon Council report).
  • 2025‑11‑03: HTA Design announces planning approval for the 447‑home Botanical House scheme (HTA Design).
  • 2026‑02‑19: Estates Gazette reports Amro’s decision to switch from residential towers to an aparthotel (Estates Gazette).
  • 2026‑02‑20: Serviced Apartment News reports the £24 million acquisition and Q1 2027 completion target (Serviced Apartment News).
  • 2026‑06‑17: Inside Croydon reports the revised scheme will be called The Canopy and contain 246 studios and apartments (Inside Croydon).
Additional sources

insidecroydon.com, insidecroydon.com, insidecroydon.com, eg.mydigitalpublication.co.uk

Frequently asked questions about the Croydon Park Hotel

Is the Croydon Park Hotel still open?

No. The hotel is closed and the site is being redeveloped into an aparthotel called The Canopy. Serviced Apartment News and Inside Croydon both reported that the building is vacant and undergoing conversion.

What is an aparthotel?

An aparthotel combines hotel‑style services (reception, cleaning, amenities) with self‑contained living spaces and kitchenettes. The Canopy is intended to serve both long‑ and short‑stay guests, according to the developer cited by Estates Gazette.

How many rooms will the new development have?

The Canopy is reported to contain 246 studios and apartments, according to local news outlet Inside Croydon. The earlier Botanical House scheme had consent for 447 homes.

Who is Amro Partners?

Amro Partners is a London‑based build‑to‑rent and aparthotel developer. It acquired the Croydon Park Hotel site along with joint‑venture partner Flemyn for £24 million, as reported by Serviced Apartment News.

What happened to the original hotel building?

The original hotel structure is being retained and upgraded for the aparthotel conversion, rather than demolished. The basement and ground‑floor slab were also retained under the earlier Botanical House proposal to save embodied carbon (HTA Design).

Are there other hotels in Croydon?

Yes. Alternatives include the Hilton London Croydon, Leonardo Hotel London Croydon, and several aparthotel‑style self‑catering options near the town centre.

Does the Croydon Park Hotel have a restaurant?

The original hotel had a restaurant and bar, but these are no longer operating. The Canopy’s dining and amenity plans have not been detailed in the sources reviewed.

Sources and further reading

  • Croydon Council – Planning committee report (October 2024)
  • Greater London Authority – Planning application 23‑00872‑FUL
  • HTA Design – Planning approval for Botanical House (3 November 2025)
  • Estates Gazette – Developer rationale for aparthotel pivot (19 February 2026)
  • Serviced Apartment News – Acquisition price and Q1 2027 target (20 February 2026)
  • BD Online – Original towers and GDV (undated)
  • Inside Croydon – The Canopy name and 246‑unit figure (17 June 2026)
  • Addiscombe West community website – Local planning context